Site clearance
The process of site clearance is generally undertaken as part of enabling works, carried out to prepare a site for construction. It involves the clearing the site to allow other remedial, treatment or demolition works to take place before the actual construction works can begin.
It involves clearing a site of any machinery or equipment, unwanted surplus materials, rubbish, and so on. Site clearance may also involve clearing away vegetation and surface soil, and levelling and preparing the ground for the planned construction works. Care should be taken to ensure that there are the correct approvals in place, particularly for trees which may be protected.
A site waste management plan (SWMP) may be prepared before site clearance begins. This describes how materials will be managed efficiently and disposed of legally, explaining how the re-use and recycling of materials will be maximised. All types of waste present on the site must be removed safely and efficiently. If there is any contaminated waste or potentially hazardous substances (such as asbestos), professional disposal experts must be consulted to safely handle them.
For more information, see Site waste management plan.
Site clearance might be carried out as part of the main construction contract, or it may be carried out in advance of the main contract, and might be part of a wider contract including other enabling works or facilitating works, such as; demolition works, soil stabilisation works, services diversion, constructing access roads, and so on.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
























Comments